T/CECPA 004-2022 Active Group standards

T/CECPA 004-2022 Nuclear power plant safety review design extended-load margin verification calculation method

T/CECPA 004-2022 Nuclear power plant safety review design extended-load margin verification calculation method

Publish Date: 2022-10-25 Implement Date: 2022-10-25 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CECPA 004-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Nuclear power stations, safety
Publish Date: 2022-10-25
Implement Date: 2022-10-25

Scope

Main technical content: The scope of this document includes verifying whether the design of nuclear power plants meets the safety management requirements set forth in nuclear and radiation safety regulations, as well as the main technical requirements and design and operation requirements of nuclear power plants. This document is applicable to the verification and calculation of design expansion scenarios during the design and operation of nuclear power plants. The verification and calculation of research reactors and other nuclear facilities can be carried out with reference to this document. This document stipulates the principles involved in the verification and calculation of design expansion scenarios, the selection of calculation content, the determination of data requirements, the description of calculation software and models, model construction, result analysis, and conclusions, etc.

Development Information

Related Standards

Contact Us