T/ZZXJX 312-2024 Active Group standards

T/ZZXJX 312-2024 Urban integrated utility corridor construction period inspection and monitoring technical specification

T/ZZXJX 312-2024 Urban integrated utility corridor construction period inspection and monitoring technical specification

Publish Date: 2024-12-17 Implement Date: 2024-12-17 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/ZZXJX 312-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Earthwork, excavation, foundation construction, and underground engineering
Publish Date: 2024-12-17
Implement Date: 2024-12-17

Scope

Main technical content: 1. Scope 2. Normative reference documents 3. Terms and definitions 4. Basic requirements 4.1 Scope and classification of detection and monitoring 4.2 Basic procedures and requirements for detection work 4.3 Detection methods and sampling plans 5. Technical requirements for periodic detection and monitoring 5.1 General provisions 5.2 Materials 5.3 Components 5.4 Equipment 5.5 Structural entities 5.6 Foundations and compacted fill materials 5.7 Pit monitoring 6. Detection and monitoring reports 6.1 General provisions 6.2 Detection reports 6.3 Monitoring reports

Development Information

Related Standards

Contact Us