T/JSJTQX 22-2021
Active
Group standards
T/JSJTQX 22-2021 Post-tensioning method for prefabricated components: Specification for grouting passage construction technology
T/JSJTQX 22-2021 Post-tensioning method for prefabricated components: Specification for grouting passage construction technology
Price:
$ 20.00
Basic Information
Standard Code:
T/JSJTQX 22-2021
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated Road Engineering
Publish Date:
2021-07-06
Implement Date:
2021-08-01
Scope
Main technical content: The grouting of prestressed holes by post-tensioning method is an important work in prefabricated components. This technical specification starts with the preparation of grouting equipment, materials and mixing ratios, preparation work before grouting, grouting implementation, quality control of construction in special seasons, and defect treatment, etc. It stipulates the standardized operation methods that affect the quality of grouting in each process. This standard is of great significance for the quality control of highway construction and local highway and bridge construction in Jiangsu Province
Development Information
Related Standards
GB/T 18226-2000
Replaced
GB/T 28650-2012
Active
GB/T 28650-2012 Road safety barrel
CJ/T 107-2013
Active
CJ/T 107-2013 Shelter of bus and trolleybus for urban public transport facilities
GB/T 32233-2015
Active
GB/T 32233-2015 Technical requirement for the pavement management system
GB/T 34847-2017
Active
GB/T 34847-2017 General technical requirements of polyethylene barrier
GB/T 42334.1-2023
Active