T/JSE 2-2024 Active Group standards

T/JSE 2-2024 High-low temperature coupled desulfurization wastewater zero-discharge technology guideline

T/JSE 2-2024 High-low temperature coupled desulfurization wastewater zero-discharge technology guideline

Publish Date: 2024-11-30 Implement Date: 2025-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSE 2-2024
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated power station
Publish Date: 2024-11-30
Implement Date: 2025-01-01

Scope

Scope: This document is applicable to the zero-discharge system of desulfurization wastewater from coal-fired boilers coupled with high and low temperatures; Main technical content: This document specifies the technical requirements for the process design, material corrosion protection, detection and process control, and operation and maintenance of the zero-discharge system of desulfurization wastewater coupled with high and low temperatures.

Development Information

Related Standards

Contact Us