T/CI 174-2023 Active Group standards

T/CI 174-2023 Preparation Guidelines for Feasibility Study on Large Reservoir Dredging in the Upper Reaches of the Yangtze River

T/CI 174-2023 Preparation Guidelines for Feasibility Study on Large Reservoir Dredging in the Upper Reaches of the Yangtze River

Publish Date: 1970-01-01 Implement Date: 1970-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 43.00
Download

Basic Information

Standard Code: T/CI 174-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: -
Publish Date: 1970-01-01
Implement Date: 1970-01-01

Scope

This document sets out the format of the feasibility study report for sediment removal from large-scale reservoirs in the upper reaches of the Yangtze River (hereinafter referred to as the feasibility study report), and clarifies the preparation requirements for the following chapters in the feasibility study report: comprehensive description, basic situation, engineering geology and sediment exploration, analysis of the impact of sediment deposition on reservoirs, sediment removal tasks and scale, sediment removal plan, construction organization design, disposal and utilization of sediment removed from reservoirs, flood impact assessment, water and soil conservation assessment, environmental impact assessment, labor safety and industrial hygiene, investment estimation, social stability risk analysis, and conclusions and recommendations. This document is applicable to the preparation of feasibility study reports for sediment removal from large-scale reservoirs in the upper reaches of the Yangtze River. The preparation of feasibility study reports for sediment removal from reservoirs in other regions and of other sizes can be carried out with reference to this document.

Development Information

Word Count: 21 Thousand words

Related Standards

Contact Us