GB/T 3794-1983
Abolished
T/EES 004-2023
Active
Group standards
T/EES 004-2023 Design specifications for waste heat recovery and heat supply system of coal-fired power plant based on supercharger
T/EES 004-2023 Design specifications for waste heat recovery and heat supply system of coal-fired power plant based on supercharger
Price:
$ 20.00
Basic Information
Standard Code:
T/EES 004-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Energy, nuclear technology
ICS Name:
Integrated Energy and Heat Transfer Engineering
Publish Date:
2023-09-21
Implement Date:
2023-09-21
Pages:
15 pages
Scope
Scope: This document specifies the basic requirements, main equipment selection, and design requirements for the waste steam heat recovery and heating system of steam turbine units in thermal power plants based on reheating steam engines; Main technical content: This document is applicable to the design and engineering acceptance of the waste steam heat recovery and heating system of steam turbine units in thermal power plants based on reheating steam engines.
Development Information
Related Standards
GB/T 5623-1985
Replaced
GB/T 5623-1985 Guides for the stipulation and administration of electricity consumption norm of product
GB/T 6421-1986
Abolished
GB/T 6421-1986 Methods for drawing energy flow diagram of industrial enterprise
GB/T 6422-1986
Replaced
GB/T 6422-1986 Directives for measuring and testing energy consumption in industrial enterprises
GB/T 6425-1986
Replaced
GB/T 6425-1986 Nomenclature for thermal analysis
GB/T 8174-1987
Replaced