JG/T 151-2015
Active
T/CECS 118-2017
Active
Group standards
T/CECS 118-2017 Cooling tower acceptance testing procedures
T/CECS 118-2017 Cooling tower acceptance testing procedures
Price:
$ 20.00
Basic Information
Standard Code:
T/CECS 118-2017
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Industrial automation instrumentation and control devices
ICS Name:
Other aspects
Publish Date:
2017-05-22
Implement Date:
2017-09-01
Scope
This procedure is applicable to the acceptance test of wet cooling towers at the installation site, but not to the acceptance test of dry cooling towers, dry-wet cooling towers, and jet cooling towers. General principles, terms and symbols, preparation before testing, testing conditions and requirements, testing instruments and measurement methods, test data processing, evaluation of test results, water loss test of spray droplets, noise test, test and evaluation of small FRP cooling towers, test reports, etc.
Development Information
Replace the following standards
CECS 118-2000
Related Standards
DB11/T 2231-2023
Active
DB11/T 2231-2023 Planning and Construction Management Electronic Review Data Standard
DB11/T 383-2023
Active
DB11/T 383-2023 Safety documentation management regulations for construction site construction works
DB11/T 945.1-2023
Active
DB11/T 945.1-2023 Safety, Environmental Protection and Fire Protection Standards for Construction Worksites - Part 1: General Guidelines
DB64/ 266-2018
Active
DB64/ 266-2018 Construction project data management regulations
DB23/T 3350-2022
Active