T/CEC 253-2019 Active Group standards

T/CEC 253-2019 "Source-network-load friendly interactive precise load balancing system technology specification"

T/CEC 253-2019 "Source-network-load friendly interactive precise load balancing system technology specification"

Publish Date: 2019-11-21 Implement Date: 2020-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 253-2019
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: The integrated transmission and distribution network
Publish Date: 2019-11-21
Implement Date: 2020-01-01

Scope

This standard specifies the technical requirements for a precise load shedding system for friendly interaction between power sources, grids, and loads, including the technical requirements for five components of the system: the dispatching load control master station, the marketing control master station, the marketing control regional network, the grid-load interaction terminal, and test and inspection. This standard applies to rapid emergency response to situations such as section over-limit, over-use of interconnection lines, and insufficient spinning reserve in scenarios of friendly interaction between power sources, grids, and loads involving high-power power shortages, which require responses within seconds or minutes.

Development Information

Related Standards

Contact Us