T/CPIA 0011.203-2019 Active Group standards

T/CPIA 0011.203-2019 Household photovoltaic grid-connected power generation system Part 2-3: Design specification for structural design

T/CPIA 0011.203-2019 Household photovoltaic grid-connected power generation system Part 2-3: Design specification for structural design

Publish Date: 1970-01-01 Implement Date: 1970-01-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 31.00
Out of stock

Basic Information

Standard Code: T/CPIA 0011.203-2019
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: -
Publish Date: 1970-01-01
Implement Date: 1970-01-01

Scope

This part of T/CPIA 0011 specifies the structural design requirements, bracket design, foundation design, and other aspects of the design specifications for household photovoltaic grid-connected power generation systems. This part applies to household photovoltaic grid-connected power generation systems that are connected to the user's side grid or public grid at a voltage level of 220V or 380V. For a 220V voltage level, the single-point access capacity should not exceed 8kW; for a 380V voltage level, the single-point access capacity should not exceed 400kW. This part does not apply to photovoltaic systems with energy storage, concentrating photovoltaic systems, BIPV photovoltaic systems, and double-sided module photovoltaic power generation systems.

Development Information

Word Count: 16 Thousand words

Same series standard

Related Standards

Contact Us