T/CASME 478-2023 Active Group standards

T/CASME 478-2023 Power transmission line condition monitoring system gateway technical requirements

T/CASME 478-2023 Power transmission line condition monitoring system gateway technical requirements

Publish Date: 2023-06-29 Implement Date: 2023-07-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/CASME 478-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Electrician
ICS Name: \nTransmission lines and distribution lines
Publish Date: 2023-06-29
Implement Date: 2023-07-01
Pages: 11 pages

Scope

Scope: This document is applicable to the design and manufacture of gateways for transmission line condition monitoring systems. Main technical content: This document specifies the basic requirements, functional requirements, and performance requirements of gateways for transmission line condition monitoring systems.

Development Information

Pages: 11 pages

Related Standards

Contact Us