GB/T 3794-1983
Abolished
T/CEC 160-2018
Active
Group standards
T/CEC 160-2018 Substation robotic inspection system centralized monitoring technology guidelines
T/CEC 160-2018 Substation robotic inspection system centralized monitoring technology guidelines
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 160-2018
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Integrated Energy and Heat Transfer Engineering
Publish Date:
2018-01-24
Implement Date:
2018-04-01
Scope
Main technical content: This standard specifies the centralized monitoring architecture, functional requirements, performance indicators, technical conditions, inspection, and marking, packaging, transportation, and storage of the robot inspection system for substations.
Development Information
Related Standards
GB/T 5623-1985
Replaced
GB/T 5623-1985 Guides for the stipulation and administration of electricity consumption norm of product
GB/T 6421-1986
Abolished
GB/T 6421-1986 Methods for drawing energy flow diagram of industrial enterprise
GB/T 6422-1986
Replaced
GB/T 6422-1986 Directives for measuring and testing energy consumption in industrial enterprises
GB/T 6425-1986
Replaced
GB/T 6425-1986 Nomenclature for thermal analysis
GB/T 8174-1987
Replaced