T/CPI 13006-2023 Active Group standards

T/CPI 13006-2023 175MPa gas production wellhead equipment performance test method

T/CPI 13006-2023 175MPa gas production wellhead equipment performance test method

Publish Date: 2023-12-15 Implement Date: 2024-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CPI 13006-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Exploration and drilling equipment
Publish Date: 2023-12-15
Implement Date: 2024-02-01

Scope

Main technical content: This document specifies the requirements for instruments and equipment, samples, design verification tests, factory acceptance tests, test methods, acceptance criteria, and test reports for the performance tests of 175MPa gas wellhead devices. This document is applicable to the design verification tests and factory acceptance tests of gas wellhead devices with a product specification level of PSL3G and PSL4

Development Information

Related Standards

Contact Us