DB34/T 1928-2013 Active Anhui ProvinceLocal standards

DB34/T 1928-2013 Cement soil sheet for retaining wall test specification in water conservancy and hydropower engineering

DB34/T 1928-2013 Cement soil sheet for retaining wall test specification in water conservancy and hydropower engineering

Publish Date: 2013-08-28 Implement Date: 2013-09-28 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Download

Basic Information

Standard Code: DB34/T 1928-2013
Standard Type: Local standards
Standard Status: Active
is_force_gb: no
CCS Name: Hydropower projects
ICS Name: Hydraulic engineering
Publish Date: 2013-08-28
Implement Date: 2013-09-28
Pages: 51 pages

Scope

This standard specifies the terms and definitions of cement-soil cutoff walls in water conservancy and hydropower projects, the preparation of cement-soil samples, tests on the physical properties of cement-soil, tests on the mechanical properties of cement-soil, permeability tests of cement-soil cutoff walls, and tests on the thickness and uniformity of cement-soil cutoff walls. This standard applies to indoor tests, on-site tests, and quality inspections of cement-soil cutoff walls in water conservancy and hydropower projects. Other similar projects may refer to this standard for implementation. In addition to complying with this standard, the testing and evaluation of cement-soil cutoff walls in water conservancy and hydropower projects shall also comply with the provisions of relevant national and industry standards currently in force.

Development Information

Pages: 51 pages

Related Standards

Contact Us