NB/T 11045.4-2025 Active Industry standards-Energy

NB/T 11045.4-2025 Page 4: Shale gas production and well-completion process specification: Gas lift production method (gas lift operation) is the method for extracting natural gas by pumping liquids to generate high-pressure in the well and use the fluid flow back effect to extract gas from the well

NB/T 11045.4-2025 Page 4: Shale gas production and well-completion process specification: Gas lift production method (gas lift operation) is the method for extracting natural gas by pumping liquids to generate high-pressure in the well and use the fluid flow back effect to extract gas from the well

Publish Date: 2025-09-28 Implement Date: 2026-03-28 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: NB/T 11045.4-2025
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: Oil extraction
ICS Name: The extraction and processing of oil and natural gas
Publish Date: 2025-09-28
Implement Date: 2026-03-28

Scope

This document specifies the process design, construction requirements, gas lift commissioning and operation, and health, safety, and environmental control requirements for gas lift extraction from shale gas wells. This document is applicable to gas lift extraction operations in shale gas wells.

Development Information

Same series standard

Related Standards

Contact Us