T/GES 004-2023 Active Group standards

T/GES 004-2023 Pillar load switch system

T/GES 004-2023 Pillar load switch system

Publish Date: 2018-01-05 Implement Date: 2023-12-10 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/GES 004-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: High-voltage switchgear
ICS Name: Comprehensive Electrical Engineering
Publish Date: 2018-01-05
Implement Date: 2023-12-10

Scope

Scope: This document specifies the technical requirements for the functional design, structure, performance, and testing of the main body and ancillary equipment of the on-pole load switch system. This document is applicable to on-pole load switch systems and their ancillary equipment with a frequency of 50Hz and a voltage level of 10kV. Main technical content: This document specifies the technical requirements for the functional design, structure, performance, and testing of the main body and ancillary equipment of the on-pole load switch system.

Development Information

Related Standards

Contact Us