T/CEC 5070-2022 Active Group standards

T/CEC 5070-2022 Design guidelines for a seawater pumped hydrostorage power station

T/CEC 5070-2022 Design guidelines for a seawater pumped hydrostorage power station

Publish Date: 2022-10-26 Implement Date: 2023-02-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 5070-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Hydraulic engineering
Publish Date: 2022-10-26
Implement Date: 2023-02-01

Scope

In order to standardize the design principles and technical requirements of seawater pumped storage power stations and ensure the quality of engineering design, these guidelines are formulated. These guidelines are applicable to the design of island-type pumped storage power stations. These guidelines cover the main content and general requirements of the design of seawater pumped storage power stations. The specific content and depth requirements of the survey and design work at each stage shall comply with these guidelines, as well as the current industry standards, including "Specifications for Site Selection and Planning of Pumped Storage Power Stations" NB/T 35009, "Specifications for Pre-Feasibility Study Report of Hydropower Projects" NB/T 10337, "Specifications for Feasibility Study Report of Hydropower Projects" DL/T 5020, "Specifications for Bidding Design Report of Hydropower Projects" DL/T 5212, and "Specifications for Design of Pumped Storage Power Stations" NB/T 10072.

Development Information

Related Standards

Contact Us