T/CCIAT 0007-2019 Wind-blown sand roadbed filling (wet pressing) construction standards
T/CCIAT 0007-2019 Wind-blown sand roadbed filling (wet pressing) construction standards
Basic Information
Scope
Main technical content: The standard consists of 8 chapters: 1. General provisions; 2. Terms; 3. Construction process; 4. Construction preparation; 5. Construction key points; 6. Construction measures in winter and rainy seasons; 7. Construction safety and environmental protection; 8. Construction quality acceptance standards. There are also two appendices and explanations of the provisions, among which Appendix B describes the test methods for aeolian sand materials. The standard provides a detailed introduction to the process flow and technical requirements of the wet-compression construction of aeolian sand roadbeds, with an emphasis on the guidelines that should be followed during construction and the key points of quality, safety, and environmental protection that should be achieved.