T/CSEE 0294-2022 Active Group standards

T/CSEE 0294-2022 Technical Regulations for Water Flushing Before Full-Scale Startup of Infrastructure Units in Thermal Power Plants

T/CSEE 0294-2022

Publish Date: 2022-09-27 Implement Date: 2022-12-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CSEE 0294-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated power station
Publish Date: 2022-09-27
Implement Date: 2022-12-01

Scope

Main technical content: This document specifies the water flushing process of the thermal system for boiler units and direct current boiler units from water intake to the turbine's run-up, as well as the corresponding technical requirements for sampling point control, analysis and monitoring items, and flushing water quality indicators. This document is applicable to boiler units and direct current boiler units of all pressure grades in newly built (expanded) or reconstructed thermal power plants during the water flushing process before the full-scale start-up.

Development Information

Related Standards

Contact Us