T/CNS 63-2022 Active Group standards

T/CNS 63-2022 High-temperature gas-cooled reactor nuclear power plant nuclear power control system closed-loop test guidelines

T/CNS 63-2022 High-temperature gas-cooled reactor nuclear power plant nuclear power control system closed-loop test guidelines

Publish Date: 2022-12-16 Implement Date: 2023-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Download

Basic Information

Standard Code: T/CNS 63-2022
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Energy, nuclear technology
ICS Name: Nuclear power stations, safety
Publish Date: 2022-12-16
Implement Date: 2023-04-01
Pages: 6 pages

Scope

Scope: This document is applicable to the closed-loop test of the nuclear power control system in high-temperature gas-cooled reactor nuclear power plants; Main technical content: This document specifies the requirements for the test purposes, test conditions, test methods, precautions, test data, and reports of the closed-loop test of the nuclear power system in high-temperature gas-cooled reactor nuclear power plants during the commissioning phase.

Development Information

Pages: 6 pages

Related Standards

Contact Us