T/CSEE 0118-2019
Active
Group standards
T/CSEE 0118-2019 Procedures for Underwater Long Length Cable Installation Technology Guideline
T/CSEE 0118-2019 Procedures for Underwater Long Length Cable Installation Technology Guideline
Price:
$ 20.00
Basic Information
Standard Code:
T/CSEE 0118-2019
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Comprehensive Electrical Engineering
Publish Date:
2019-03-01
Implement Date:
2019-05-01
Scope
Main technical content: This standard specifies the preliminary preparation, civil construction, cable transportation, laying construction, protection installation, accessory installation, completion test, and fault repair of large-length submarine power cables (hereinafter referred to as submarine cables), mainly targeting the construction technology of submarine cables crossing oceans, lakes, rivers, and other water bodies. This standard applies to the construction technology of submarine (optical-electrical composite) cables laid on the seabed (or waterbed), and the construction of submarine communication optical cables shall be implemented in accordance with this standard
Development Information
Related Standards
GB/T 2681-1981
Abolished
GB/T 2682-1981
Abolished
GB/T 2682-1981 Colors of indicator lights and push-buttons used in electrical assembly devices
GB/T 3926-1983
Replaced
GB/T 3926-1983 Rated voltage for medium frequency equipment
GB/T 4064-1983
Abolished
GB/T 4064-1983 General guide for designing of electrical equipment to satisfy safety requirements
GB/T 4776-1984
Replaced
GB/T 4776-1984 Electrical safety terminology
GB/T 5080.4-1985
Active