T/CPCIF 0054.6-2021 Active Group standards

T/CPCIF 0054.6-2021 Guidelines for the Development and Construction of Chemical Industry Parks - Part 6: Infrastructure and Utilities Infrastructure and Utilities Engineering Infrastructure and Utilities Engineering

T/CPCIF 0054.6-2021 Guidelines for the Development and Construction of Chemical Industry Parks - Part 6: Infrastructure and Utilities Infrastructure and Utilities Engineering Infrastructure and Utilities Engineering

Publish Date: 2021-12-30 Implement Date: 2022-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CPCIF 0054.6-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Chemical industry
ICS Name: Chemical production
Publish Date: 2021-12-30
Implement Date: 2022-04-01

Scope

Scope: This document establishes the general principles for the infrastructure and public works of chemical parks, including water supply engineering, drainage engineering, power supply engineering, heating engineering, centralized supply systems for industrial gases, public pipe galleries, centralized disposal facilities for solid waste, communication engineering, and the development and construction of flood control and drainage facilities. This document applies to the development and construction of infrastructure and public works in chemical parks. Main technical content: 4. General Principles 4.1 The development and construction of infrastructure and public works in chemical parks should be coordinated with the overall planning and construction progress of the chemical parks, and emphasis should be placed on the overall planning, coordination, and sharing among various projects. 4.2 The development and construction of infrastructure and public works in chemical parks should comply with relevant national, industry, and local standards and norms, and adopt basic materials that meet relevant national, industry, and local regulations. 4.3 Units responsible for the development and construction of infrastructure and public works in chemical parks should have relevant design and construction experience.

Development Information

Same series standard

Related Standards

Contact Us