T/JSIA 0003-2023 Active Group standards

T/JSIA 0003-2023 Replacement Test Specification for Domestic Relational Database

T/JSIA 0003-2023 Replacement Test Specification for Domestic Relational Database

Publish Date: 2023-12-12 Implement Date: 2023-12-20 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/JSIA 0003-2023
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Software development and system files
Publish Date: 2023-12-12
Implement Date: 2023-12-20

Scope

Main technical content: Design and preparation of a test plan for replacing domestic relational databases. The following aspects should be clearly defined: a) Test objectives: The overall goals to be achieved through the implementation of the plan. b) Test basis: Standards, specifications, and technical designs on which the test is based. c) Test environment: A description of the resource requirements for the test, including software, hardware, networks, data, and personnel. The test environment should meet the requirements of the system testing contract (or project design) and typically be the actual operating environment of the database system. Among these, the test data simulates the actual operating environment of the tested database system, collects as much realistic data as possible, performs necessary data conversion, and validates the test data. d) Test content: Select test items for replacing domestic relational databases, including but not limited to basic capability testing, availability and high reliability testing, usability testing, compatibility testing, distributed database testing, performance testing, and application business scenario testing. The specific items can be adjusted based on technical designs, user needs, or system usage. e) Test methods: The methods, techniques, tools, and approaches used in the test, along with estimates of the time required for each task and the main constraints of the test. f) Test personnel: The division of responsibilities among the members of the test team. g) Schedule: The time arrangements for different phases of the test, entry criteria for the test, and exit criteria for the test. h) Risks and strategies: Conduct risk analysis and evaluation for each phase of the test and develop corresponding countermeasures. A review of the test plan should be conducted before the test execution. The specific contents and requirements of the review should include: a) The completeness, accuracy, and stan

Development Information

Related Standards

Contact Us