DL/T 327-2023 Active Industry standards-Electricity

DL/T 327-2023 Step-wise plumb line protractor

DL/T 327-2023 Step-wise plumb line protractor

Publish Date: 2023-10-11 Implement Date: 2024-04-11 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 30
Out of stock

Basic Information

Standard Code: DL/T 327-2023
Standard Type: Industry standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: Integrated power station
Publish Date: 2023-10-11
Implement Date: 2024-04-11

Scope

This document specifies the product structure, principles, specifications, technical requirements, test methods, inspection rules, marking, packaging, transportation, and storage requirements of stepwise vertical coordinate instruments. This document is applicable to the design, production, use, maintenance, and inspection testing of stepwise vertical coordinate instruments (hereinafter referred to as vertical coordinate instruments) used in the measurement of displacement by the vertical line method in dam and other geotechnical engineering safety monitoring.

Development Information

Replace the following standards

Related Standards

Contact Us