T/CGMA 1101-2024 Installation and acceptance specifications for integrated equipment of gas turbines and blower co-axial with blast furnace waste heat and waste pressure energy recovery equipment (BPRT)
T/CGMA 1101-2024 Installation and acceptance specifications for integrated equipment of gas turbines and blower co-axial with blast furnace waste heat and waste pressure energy recovery equipment (BPRT)
Basic Information
Scope
Scope: This document specifies the construction preparation, equipment foundation treatment and acceptance, overall installation of the unit, installation of axial compressors, installation of gas turbines, installation of electric motors, installation of speed-change clutches and gearboxes, installation of auxiliary equipment, pipeline installation, electrical installation, automatic control installation, test running, and linkage test running and project acceptance of the BPRT unit for the recovery of high-furnace waste heat and residual pressure energy with coaxial gas turbines and blowers. This document applies to the civil engineering foundation, equipment and pipelines, electrical installation, automatic control installation, test running and acceptance of the BPRT unit for the recovery of high-furnace waste heat and residual pressure energy with coaxial gas turbines and blowers, including axial compressors, gearboxes, electric motors, speed-change clutches, gas turbines, and auxiliary equipment such as lubricating oil stations, power oil stations, air filters, exhaust silencers, valves, electrical equipment, and automatic control systems. Main technical content: This document specifies the construction preparation, equipment foundation treatment and acceptance, overall installation of the unit, installation of axial compressors, installation of gas turbines, installation of electric motors, installation of speed-change clutches and gearboxes, installation of auxiliary equipment, pipeline installation, electrical installation, automatic control installation, test running and linkage test running and project acceptance of the BPRT unit for the recovery of high-furnace waste heat and residual pressure energy with coaxial gas turbines and blowers. This document applies to the civil engineering foundation, equipment and pipelines, electrical installation, automatic control installation, test running and acceptance of the BPRT unit for the recovery of high-furnac