T/GERS 0024-2023 The specification for the construction of a smart gas meter verification laboratory without human presence
T/GERS 0024-2023 The specification for the construction of a smart gas meter verification laboratory without human presence
Basic Information
Scope
Main technical content: This standard is written in accordance with the provisions of GB/T 1.1—2020, and the relevant content has been verified, showing strong operability and scientificity. Based on the survey and collection of opinions, the main technical content of the standard is determined as follows: 1. Clarify the relevant terms and definitions for the construction of intelligent gas meter calibration unmanned laboratories. 2. Clarify the general principles for the construction of unmanned laboratories, including basic requirements, site selection requirements, general construction requirements, and functional zoning regulations. 3. Clarify the construction organization requirements for unmanned laboratories, including regulations on institutional and personnel organization, equipment, tools, and material management, technical management, construction interface tracking, and data management. 4. Clarify the construction requirements for sample transfer systems, including requirements for palletizing transfer systems, box transfer systems, and gas meter transfer systems. At the same time, the transfer speeds of each transfer system should be compatible with each other. 5. Clarify the construction requirements for gas meter automatic detection systems, including general requirements and requirements for sealing detection, functional inspection, pressure loss detection, and indication error detection. 6. Clarify the construction requirements for intelligent auxiliary work systems, including functional requirements and requirements for sorting gas meters that pass or fail the calibration. The functional requirements are to realize the intelligentization of auxiliary processes before and after gas meter calibration.