T/CAGHP 004-2018 Active Group standards

T/CAGHP 004-2018 Anti-slip pile construction technical regulations (Trial)

T/CAGHP 004-2018 Anti-slip pile construction technical regulations (Trial)

Publish Date: 2018-01-01 Implement Date: 2018-04-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CAGHP 004-2018
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: Environment quality standards
ICS Name: Geology, meteorology, and hydrology
Publish Date: 2018-01-01
Implement Date: 2018-04-01

Scope

Main technical content: This standard specifies the terms and definitions of anti-slide pile construction, basic requirements, construction preparation, excavation of pile holes for bored piles, fabrication and installation of reinforcing bars for bored piles, concrete pouring for bored piles, drilling pile construction, micro-pile construction, project monitoring, quality inspection and acceptance, environmental protection and safety measures, and requirements for maintenance of anti-slide piles. This standard is applicable to anti-slide pile construction in geological disaster control projects, and can also be used in anti-slide pile construction in slope projects. For anti-slide pile projects in collapsible loess, permafrost, expansive soils, and other special geotechnical conditions, as well as in erosive environments, they shall also comply with the provisions of the relevant national standards currently in force.

Development Information

Related Standards

Contact Us