T/SNEIA 3-2025 Guidelines for accessing distributed power resources to the virtual power plant resource aggregation platform
T/SNEIA 3-2025 Guidelines for accessing distributed power resources to the virtual power plant resource aggregation platform
Price:
$ 20.00
Basic Information
Standard Code:
T/SNEIA 3-2025
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
The integrated transmission and distribution network
Publish Date:
2025-07-25
Implement Date:
2025-07-25
Scope
This standard specifies the overall principles, functional architecture, functional description, functional requirements, data interaction architecture, data collection models, and other technical requirements for the distributed power access to the virtual power plant resource aggregation platform. This standard is applicable to the planning, design, construction, and operation of distributed power access to the virtual power plant resource aggregation platform, and is suitable for various objects (manufacturing enterprises, industrial parks, commercial or residential areas, etc.) participating in typical application scenarios such as demand response and power trading in the distributed energy access to the virtual power plant.
Development Information
Related Standards
GB/T 15543-1995
Replaced
GB/T 15544-1995
Replaced
GB/T 15544-1995 Short-circuit current calculation in three-phase a.c. systems
GB/T 18857-2002
Replaced
GB/T 18857-2002 Technical guide for live working in distribution line
GB/T 13730-2002
Active
GB/T 13730-2002 Dispatching automation systems for distric power networks
GB/T 2694-2003
Replaced
GB/T 2694-2003 Transmission line tower—Technical requirements for manufacturing
GB/T 11920-2008
Active