GB/T 2681-1981
Abolished
T/CSEE 0039-2017
Active
Group standards
T/CSEE 0039-2017 Guidelines for Start-up Tests of Hidden Pole Synchronous Generators
T/CSEE 0039-2017
Price:
$ 20.00
Basic Information
Standard Code:
T/CSEE 0039-2017
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Construction machinery and equipment
ICS Name:
Comprehensive Electrical Engineering
Publish Date:
2018-02-28
Implement Date:
2018-05-01
Scope
Main technical content: This standard specifies the procedures and requirements for the first start-up test of hidden-pole synchronous generators (hereinafter referred to as generators). This standard applies to the first start-up test of hidden-pole synchronous generators with a capacity of 200MVA or more. The start-up test after shutdown or overhaul can be carried out with reference to this standard; generators with a capacity of less than 200MVA can also be operated with reference to this standard.
Development Information
Related Standards
GB/T 2682-1981
Abolished
GB/T 2682-1981 Colors of indicator lights and push-buttons used in electrical assembly devices
GB/T 3926-1983
Replaced
GB/T 3926-1983 Rated voltage for medium frequency equipment
GB/T 4064-1983
Abolished
GB/T 4064-1983 General guide for designing of electrical equipment to satisfy safety requirements
GB/T 4776-1984
Replaced
GB/T 4776-1984 Electrical safety terminology
GB/T 5080.4-1985
Active