T/CEC 5057.1-2021 Active Group standards

T/CEC 5057.1-2021 3D Design Application Scope and Depth Regulations for Transmission and Substations Engineering - Part 1: Substations (Transmission Stations)

T/CEC 5057.1-2021 3D Design Application Scope and Depth Regulations for Transmission and Substations Engineering - Part 1: Substations (Transmission Stations)

Publish Date: 2021-06-29 Implement Date: 2021-10-01 For services related to genuine standard inquiry, procurement, translation, and other related services in China, please Contact Us
Price: $ 20.00
Out of stock

Basic Information

Standard Code: T/CEC 5057.1-2021
Standard Type: Group standards
Standard Status: Active
is_force_gb: no
CCS Name: -
ICS Name: \nTransmission lines and distribution lines
Publish Date: 2021-06-29
Implement Date: 2021-10-01

Scope

Main technical content: 1.0.1 This section specifies the requirements for the design scope and depth of various professional disciplines in the 3D design of substation (converter station) projects (hereinafter referred to as the project). 1.0.2 This section applies to the 3D design of 110 (66) kV and above projects during the preliminary design, construction drawing design, and completion drawing preparation stages. 1.0.3 The 3D design of the project shall meet the requirements of current national and industry regulations and standards, and the storage and use of the results shall comply with relevant information security requirements.

Development Information

Same series standard

Related Standards

Contact Us