GB/T 14627-1993
Replaced
T/CEC 5011-2019
Active
Group standards
T/CEC 5011-2019 Pumping Hydro Storage Power Station Computer Monitoring System Design Specification
T/CEC 5011-2019 Pumping Hydro Storage Power Station Computer Monitoring System Design Specification
Price:
$ 20.00
Basic Information
Standard Code:
T/CEC 5011-2019
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
-
ICS Name:
Hydraulic engineering
Publish Date:
2019-04-24
Implement Date:
2019-07-01
Scope
Main technical content: 1.0.1 This standard specifies the architecture and functions of the computer monitoring system for pumped storage power stations, hardware configuration and selection, technical requirements for software, and the principles that should be followed in the design of secondary wiring and other aspects. 1.0.2 This standard is applicable to the design of computer monitoring systems for pumped storage power stations.
Development Information
Related Standards
GB/T 15468-1995
Replaced
GB/T 15468-1995 Fundamental technical requirements for hydraulic turbines
GB/T 15469-1995
Replaced
GB/T 15469-1995 Cavitation pitting evaluation in reaction hydraulic turbines
GB/T 15613-1995
Replaced
GB/T 15613-1995 Code for model acceptance tests of hydraulic turbines
GB/T 16166-1996
Replaced
GB/T 16166-1996 Sacrificial anode cathodic protection for seawater cooling system in coastal power station
GB/T 10969-1996
Replaced