GB/T 4773-1984
Replaced
T/ACEF 091-2023
Active
Group standards
T/ACEF 091-2023 The high-speed steam turbine configuration and operation specifications for a biomass power plant
T/ACEF 091-2023 The high-speed steam turbine configuration and operation specifications for a biomass power plant
Price:
$ 20.00
Basic Information
Standard Code:
T/ACEF 091-2023
Standard Type:
Group standards
Standard Status:
Active
is_force_gb:
no
CCS Name:
Electrician
ICS Name:
Gas turbines, steam turbines, and steam engines
Publish Date:
2023-11-13
Implement Date:
2023-11-20
Scope
Scope: This document specifies the types and configurations of high-speed turbines for biomass power plants, as well as their technical requirements, operational requirements, and maintenance and repair requirements. This document applies to the configuration and operation and maintenance of high-speed turbines for biomass power plants with an installed capacity of less than 100 MW. Main technical content: Applicable scope, normative reference documents, terms and definitions, types and configurations of high-speed turbines, technical requirements, operational requirements, and maintenance and repair requirements.
Development Information
Related Standards
GB/T 5578-1985
Replaced
GB/T 5578-1985 Specification for stationary steam turbines driving generator
GB/T 11369-1989
Replaced
GB/T 11369-1989 Light weight gas turbines exhaust smokes measurement
GB/T 11370-1989
Replaced
GB/T 11370-1989 Gas emissions measurement of light weight gas turbines
GB/T 11371-1989
Replaced
GB/T 11371-1989 Light weight gas turbine operation and maintenance
GB/T 13399-1992
Replaced