PDF
GB 45669.4-2025 Active
GB 45669.4-2025 Norm of water intake for industry in the Yellow River basin—Part 4:Cement
Abstract
This document stipulates the calculation method, target values, and management requirements for the mandatory water consumption quotas of cement in the Yellow River basin.
This document applies to the water consumption management of existing, new, renovated, and expanded silicate cement production enterprises in the Yellow River basin and other related county-level administrative regions of the provinces and autonomous regions through which the Yellow River flows.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Active |
| Standard Code | GB 45669.4-2025 |
| CCS | Outdoor water supply and drainage projects |
| ICS | Industrial water |
| Implement Date | 2025-06-01 |
Price
$ 23.00
Subtotal
$ 23.00
Tax
$ 0.00
Order Total (incl. tax)
$ 23.00