PDF

T/DZJN 82-2022 Active

T/DZJN 82-2022 Data center evaporative cooling air conditioning system operation and maintenance management

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2022-03-15

Abstract

Main technical content: 4 Basic Provisions 4.1 Operation and Maintenance Objectives 4.2 Operation and Maintenance Scope 4.3 Basic Requirements for Operation and Maintenance 4.4 Operation and Maintenance Level Assessment 4.5 Monitoring and Control 5 Operation Management 5.1 General Provisions 5.2 Setting of Operating Environmental Parameters 5.3 All-Air Evaporative Cooling Air Conditioning System 5.4 Air-Water Evaporative Cooling Air Conditioning System 5.5 Operation Modes 5.6 Monitoring and Control System 5.7 Operation Optimization 6 Maintenance Management 6.1 General Provisions 6.2 Maintenance of Evaporative Cooling Equipment 6.2.1 Direct Evaporative Cooling Fresh Air Units 6.2.2 Indirect Evaporative Cooling Air Conditioning Units 6.2.3 Indirect Evaporative Chilled Water Units 6.2.4 Evaporative Condensing Air Conditioning Units 6.2.5 Evaporative Condensing Chilled Water Units 6.2.6 Evaporative Condensing and Fluoride Pump Heat Pipe Systems 6.3 Environmental and Equipment Monitoring System 6.4 Emergency Management Process 7 Management System 7.1 General Provisions 7.2 System Structure

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/DZJN 82-2022
CCS Fire fighting
ICS Refrigeration technology
Implement Date 2022-05-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us