PDF
T/CRES 0015-2023 Active
Technical Specifications for Flywheel Energy Storage Frequency Regulation Power Station, T/CRES 0015-2023
Abstract
Main technical content: This document specifies the equipment and grid-connected conditions of the flywheel energy storage frequency regulation power station, as well as the functional requirements and technical performance indicators of primary and secondary frequency regulation. This document is applicable to flywheel energy storage frequency regulation power stations with a rated power of 10MW or more.
General Product Information
| Document Type | Group standards |
|---|---|
| Standard Status | Active |
| Standard Code | T/CRES 0015-2023 |
| ICS | Wind power generation systems and other energy sources |
| Implement Date | 2023-09-01 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00