PDF

T/ZDL 018-2023 Active

T/ZDL 018-2023 Special freight ropeway survey technology guidelines for overhead transmission line construction

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2023-12-21

Abstract

Main technical content: 4. General Principles 4.1 Promote the mechanized construction of overhead transmission lines and standardize the depth of survey and design for ropeway projects during the planning and engineering design phases, ensuring that the route of the ropeway achieves technological advancement, economic rationality, ease of construction, and operational safety. 4.2 For the survey of the ropeway route, actively promote new technologies and methods that can accelerate project progress and improve the quality of survey work. 4.3 Before surveying the ropeway route, conduct a detailed investigation and analysis of the overhead transmission lines and select the tower locations for ropeway transportation rationally. 4.4 The survey of the ropeway route should adapt to the phases of the design and survey work for overhead transmission lines, generally divided into three stages: feasibility study stage, preliminary design stage, and construction drawing design stage. 4.5 Hydrological and meteorological surveys should be conducted on-site at each stage, and the relevant requirements should comply with the provisions of DL/T 5076.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/ZDL 018-2023
ICS \nTransmission lines and distribution lines
Implement Date 2024-01-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us