PDF

GB/T 20720.3-2010

GB/T 20720.3-2010 Enterprise-control system integration—Part 3:Activity models of manufacturing operations management

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2010-12-01

Abstract

This part of GB/T 20720 defines the activity model for manufacturing operation management and achieves the integration from the enterprise system to the control system. The activities defined in this part are consistent with the object model defined in GB/T 20720.1. The modeled activities operate between business planning and logistics management, such as the fourth-level functions defined in GB/T 20720.1 and the process control functions defined in the second level.
The scope of this part is limited to:
——Supporting the activity model for manufacturing operation management and achieving the functions of the third level.
——Identifying some data exchanges between the third-level activities.

General Product Information

Document Type National standards
Standard Status Replaced
Standard Code GB/T 20720.3-2010
CCS Computer applications
ICS Industrial automation systems
Implement Date 2011-05-01
Price $ 143
Subtotal $ 143
Tax $ 0.00
Order Total (incl. tax) $ 143

Log In

Contact Us