PDF

MT/T 1215-2024 Active

MT/T 1215-2024 Tunnelling technical specifications for bolter-miner system

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2024-12-25

Abstract

This document specifies the applicable requirements, design principles, selection and matching, technical requirements for tunneling process, and usage and management of the tunneling technology of the integrated drilling and anchoring units.
This document is applicable to the selection, design, and matching of integrated drilling and anchoring units, as well as the preparation of technical documents and guidance for construction in tunneling processes and procedures.

General Product Information

Document Type Industry standards-Coal
Standard Status Active
Standard Code MT/T 1215-2024
CCS Mining
ICS Mining and excavation
Implement Date 2025-06-25
Price $ 31.00
Subtotal $ 31.00
Tax $ 0.00
Order Total (incl. tax) $ 31.00

Log In

Contact Us