PDF
GB/T 21412.6-2009
GB/T 21412.6-2009 Petroleum and natural gas industries—Design and operation of subsea production systems—Part 6:Subsea production control systems
Abstract
This part of GB/T 21412 is applicable to the design, manufacture, testing, installation, and operation of underwater production control systems, covering control system equipment and control fluids installed on the surface and underwater. These devices are used to achieve the control of underwater oil and gas production and underwater water injection and gas injection operations. This part is also applicable to the control equipment of multi-well systems.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Replaced |
| Standard Code | GB/T 21412.6-2009 |
| CCS | Equipment used in offshore oil operations |
| ICS | Exploration and drilling equipment |
| Implement Date | 2009-10-01 |
Price
$ 70.00
Subtotal
$ 70.00
Tax
$ 0.00
Order Total (incl. tax)
$ 70.00