PDF

T/DGGC 005-2024 Active

T/DGGC 005-2024 Underground docking and shell dismantling construction technical requirements for shield tunneling

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2024-03-18

Abstract

This document specifies the relevant requirements for the underground docking and shell disposal and disassembly of shield tunneling machines.
This document is applicable to the underground docking and shell disposal and disassembly of shield tunneling machines when the receiving end of the shield tunnel does not have the conditions to set up a working well or when the economic feasibility of setting up a working well is relatively poor.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/DGGC 005-2024
CCS Earth and stone work, tunnel engineering
ICS Earthwork, excavation, foundation construction, and underground engineering
Implement Date 2024-07-01
Price $ 43.00
Subtotal $ 43.00
Tax $ 0.00
Order Total (incl. tax) $ 43.00

Log In

Contact Us