PDF

T/CNS 73-2022 Active

Guidelines for Blocked Heat Transfer Tubes in Steam Generators of High Temperature Gas-Cooled Reactor Nuclear Power Plants according to T/CNS 73-2022

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2022-12-16

Abstract

Scope: This document is applicable to the plugging of heat transfer tubes in steam generators of spherical bed modular high-temperature gas-cooled reactor nuclear power plants; Main technical content: This document specifies the technical requirements for the plugging process and plugging head requirements of heat transfer tubes in steam generators of high-temperature gas-cooled reactor nuclear power plants, evaluation tests, plugging preparation, plugging equipment requirements, plugging operator requirements, plugging implementation, and records and reports, etc.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CNS 73-2022
CCS Energy, nuclear technology
ICS Nuclear power stations, safety
Implement Date 2023-04-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us