GB/T 19964-2024 Active
GB/T 19964-2024 Technical requirements for connecting photovoltaic power station to power system
Abstract
This document specifies the active power, reactive voltage, fault tolerance, operational adaptability, power prediction, power quality, simulation models and parameters, and technical requirements of the secondary system for photovoltaic power stations connected to the power grid, as well as the content of testing and evaluation. This document is applicable to the construction, production, and operation of new, modified, and expanded photovoltaic power stations connected to the grid at a voltage level of 10 kV or higher. Photovoltaic power stations equipped with energy storage systems shall refer to and implement the provisions of this document accordingly.
General Product Information
| Document Type | National standards |
|---|---|
| Standard Status | Active |
| Standard Code | GB/T 19964-2024 |
| CCS | Solar energy |
| ICS | Solar energy engineering |
| Implement Date | 2024-03-15 |