PDF
T/DGGC 017-2022 Active
T/DGGC 017-2022 Special Site Shield Tunneling Construction Technology Specification
Abstract
This document stipulates the basic requirements for shield construction in special sections, the division of special sections, construction preparation, and shield construction requirements, as well as monitoring and measurement. This document is applicable to shield construction in special sections using the earth pressure balance mode, the slurry balance mode, and multi-mode shield construction.
General Product Information
| Document Type | Group standards |
|---|---|
| Standard Status | Active |
| Standard Code | T/DGGC 017-2022 |
| CCS | Earth and stone work, tunnel engineering |
| ICS | Earthwork, excavation, foundation construction, and underground engineering |
| Implement Date | 2023-01-01 |
Price
$ 26.00
Subtotal
$ 26.00
Tax
$ 0.00
Order Total (incl. tax)
$ 26.00