T/ZHJX 1-2023 Active
T/ZHJX 1-2023 The star rating standards for prefabricated concrete components production enterprises in Zhuhai City
Abstract
Main technical content: **Basic requirements**: Relevant procedures, business certificates, site requirements, technical staffing, production processes, quality control, integrity management, and operational management. **Production capacity**: Component production workshops, component storage areas, concrete production lines, lifting equipment, rebar processing equipment, curing equipment, other auxiliary equipment, production metering devices, and equipment management. **Technical management level**: Management system, laboratory, raw material management, production management, production record and file management, component quality management, organizational structure, employee training, and scientific research and development. **Safe and civilized production**: Corporate culture, safe and civilized production. **Green production**: Plant requirements, green production, and equipment facilities. **Integrity construction**: Sales contract management, after-sales service, integrity operation, and industry self-discipline. **Information management**: Central production control room, data management, Manufacturing Execution System (MES), intelligent office management, public information platform, and warehouse management system (WMS). **Precast component quality inspection**: Precast component process inspection, mold quality inspection, semi-finished rebar and embedded parts quality inspection, finished rebar quality and concealed acceptance inspection, concrete pouring records, PC component first-piece acceptance, finished component quality inspection records, and production line component production process inspection records.
General Product Information
| Document Type | Group standards |
|---|---|
| Standard Status | Active |
| Standard Code | T/ZHJX 1-2023 |
| ICS | Concrete and concrete products |
| Implement Date | 2023-01-01 |