PDF
DB12/ 046.106-2011
DB12/046.106-2011 Comprehensive Energy Consumption Calculation Method and Limit for Unit Output of Products. Part 106: Lime
Abstract
This section applies to the lime production process in the metallurgical industry within the administrative area of Tianjin City.
General Product Information
| Document Type | Tianjin CityLocal standards |
|---|---|
| Standard Status | Abolished |
| Standard Code | DB12/ 046.106-2011 |
| CCS | Technical management |
| ICS | Integrated Energy and Heat Transfer Engineering |
| Implement Date | 2012-01-01 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00