PDF
DB12/ 046.105-2011
DB12/ 046.105-2011 Product energy consumption calculation method and limit part 105: Coal-fired central heating heat source plant
Abstract
This part is applicable to the calculation and assessment of energy consumption of enterprises with central heating boiler rooms that are heated by thermal power plants. This part is not applicable to combined heat and power central heating.
General Product Information
| Document Type | Tianjin CityLocal standards |
|---|---|
| Standard Status | Abolished |
| Standard Code | DB12/ 046.105-2011 |
| CCS | Technical management |
| ICS | Integrated Energy and Heat Transfer Engineering |
| Implement Date | 2012-01-01 |
Price
$ 20.00
Subtotal
$ 20.00
Tax
$ 0.00
Order Total (incl. tax)
$ 20.00