PDF

T/CEPCA 1010-2024 Active

T/CEPCA 1010-2024 Electric power construction project green construction evaluation

Available format(s)
PDF
Language(s)
Chinese
Publish Date
1970-01-01

Abstract

This document stipulates the general requirements for the green construction evaluation of power construction projects such as thermal power generation (including the conventional island of nuclear power), hydropower generation (including pumped storage), wind power generation, solar power generation, power transmission and transformation projects, and energy storage power station projects. It establishes the framework of the evaluation index system, stipulates the value rules and evaluation methods of the evaluation indexes, and describes the formation rules of the evaluation results. This document is applicable to the green construction evaluation of new, reconstructed, and expanded power construction projects, providing guidance and evaluation basis for the green construction of construction projects.

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CEPCA 1010-2024
Implement Date 1970-01-01
Price $ 176.00
Subtotal $ 176.00
Tax $ 0.00
Order Total (incl. tax) $ 176.00

Log In

Contact Us