PDF

NB/T 32030-2016 Active

NB/T 32030-2016 The standard for calculating engineering survey and design fees for photovoltaic power generation projects

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2016-01-07

Abstract

It is suitable for new or expanded photovoltaic power stations, as well as distributed photovoltaic power generation projects with an installed capacity of 1MWP or more that are connected to the public power grid.

General Product Information

Document Type Industry standards-Energy
Standard Status Active
Standard Code NB/T 32030-2016
CCS Power station project
ICS Solar energy engineering
Implement Date 2016-06-01
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us