PDF

GB/T 21437.3-2012

GB/T 21437.3-2012 Road vehicles—Electrical disturbances from conduction and coupling—Part 3:Electrical transient transmission by capacitive and inductive coupling via lines other than supply lines

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2012-12-31

Abstract

This part of GB/T 21437 establishes a bench test method for evaluating the anti-interference performance of devices under test (DUTs) against electrical transient emissions coupled to non-power supply lines. The test transient pulses simulate fast electrical transient disturbances and slow electrical transient disturbances, such as those caused by inductive load switching and relay contact bouncing.
This part provides three test methods:
—— Capacitive Coupling Clamp (CCC) method;
—— Direct Capacitor Coupling (DCC) method;
—— Inductive Coupling Clamp (ICC) method.
Note: The applicability of the three test methods is shown in Table 1.
Only one method is required for slow electrical transient tests and fast electrical transient tests.
This part is applicable to road vehicles with a nominal voltage of 12 V, 24 V, or 42 V electrical systems.
For transient immunity, Appendix B provides recommended test severity levels, consistent with the Functional Performance State Classification (FPSC1) principle described in GB/T 21437.1.

General Product Information

Document Type National standards
Standard Status Replaced
Standard Code GB/T 21437.3-2012
CCS Automotive electronics, electrical equipment, and instrumentation
ICS Electric and electronic equipment
Implement Date 2013-06-01
Price $ 74
Subtotal $ 74
Tax $ 0.00
Order Total (incl. tax) $ 74

Log In

Contact Us