PDF

T/CPARK 27-2022 Active

T/CPARK 27-2022 General requirements for the whole lifecycle of bridge crane

Available format(s)
PDF
Language(s)
Chinese
Publish Date
2022-10-08

Abstract

Scope: This document specifies the general requirements, design, manufacturing, loading and unloading, installation, commissioning and testing, maintenance, and recycling for the entire life cycle of gantry cranes. This document applies to the requirements of the entire life cycle of gantry cranes. Other types of cranes can refer to and use it for reference. Main technical contents: 3 Terms and definitions 4 General requirements 5 Design 5.1 General provisions 5.2 Interface 5.3 Content 5.4 Design procedure 5.5 Design and development changes 6 Manufacturing 6.1 Manufacturing basis 6.2 Manufacturing unit conditions 6.3 Manufacturing process requirements 7 Loading and unloading 8 Installation 8.1 Preparation of installation construction plan 8.2 Installation notification and application for supervision and inspection 8.3 Acceptance and inspection upon completion 9 Commissioning and testing 10 Maintenance 11 Recycling and disposal References

General Product Information

Document Type Group standards
Standard Status Active
Standard Code T/CPARK 27-2022
CCS Mechanical
ICS Crane
Implement Date 2022-10-08
Price $ 20.00
Subtotal $ 20.00
Tax $ 0.00
Order Total (incl. tax) $ 20.00

Log In

Contact Us