PDF
DB31/T 1146.2-2019
DB31/T 1146.2-2019 Technical specification for testing performance of electrical energy storage system in smart grid——Part 2:Wind power smoothing application
Abstract
This part of DB31/T 1146 specifies the typical operating cycle, application performance test content, and test methods of energy storage systems in the application scenario of smoothing wind power output.
This part is applicable to the performance testing of electrochemical energy storage systems connected to power grids of various voltage levels in the application scenario of smoothing wind power output.
General Product Information
| Document Type | Shanghai CityLocal standards |
|---|---|
| Standard Status | Abolished |
| Standard Code | DB31/T 1146.2-2019 |
| CCS | Technical management |
| ICS | Other batteries and storage batteries |
| Implement Date | 2019-06-01 |
Price
$ 27
Subtotal
$ 27
Tax
$ 0.00
Order Total (incl. tax)
$ 27